Construction of the much anticipated Nordhavn 80 is well underway and the South Coast factory sent photos this afternoon of the build status. Pictured in the images are an N80 deck mold, bulkheads being installed in the hull of N80#1, a shot of the fiberglass tanks installed, and the flybridge deck tooling completing. Hull #1 is slated to ship from the factory late 2019/early 2020.