Nordhavn 475-46 arrives in Dana Point for commissioning
NORDHAVN 475-46 arrives in Dana Point for commissioning https://www.youtube.com/watch?v=OOk10HsSiDs
NORDHAVN 475-46 arrives in Dana Point for commissioning https://www.youtube.com/watch?v=OOk10HsSiDs
Just added to the Open House display: A brokerage Nordhavn 40. Despite COVID-19 thwarting our boat show plans, we are…
Not rain, or snow, or global pandemic can stop the Nordhavn project management team from getting their job done. PMs…
https://nordhavn.com/wp-content/uploads/2020/01/N475-nomad-1.mov
View the N475 interior, showcased in the first ever photoshoot taken aboard hull #1.
The first N475 by trawler manufacturer Nordhavn has arrived at Dana Point.
Construction of N475 hull #1 is moving along swiftly at the South Coast factory and expected to ship this fall.